2026 Detours

Blair County

Bedford County

​

  • Scope: Pavement Resurfacing  ​
  • Traffic Control: Detour (2.5 miles)​
  • Construction Timeframe: April to October 2026​
  • Detour Implementation Date: April 21, 2026​ 
  • Anticipated Date Detour to be Lifted: Four (4) to seven (7) days per ramp closure. Only one ramp will be closed at a time. 
  • Detour Route:  Continue on U.S. 30 to U.S. 220 South Cumberland exit-ramp, to the U.S. 220 South Bedford exit, to Route 4010 (Pitt Street) and back to the U.S. 220 North, I-99 North and Altoona ramp.   
  • Contractor: New Enterprise Stone & Lime Co., Inc. New Enterprise, Pa.
  • Current Contract: $6,059,067 

 

View US 30 Ramp to US 220 North I99 North Altoona Detour  (PDF).

 

 

 

 




​

Route 4019 (Reynoldsdale Road) Bridge over Oppenheimer Run in Bedford and East St. Clair Township, Bedford County

  • Scope: Bridge Replacement
  • ECMS#: 117023
  • Traffic Control: Ott Road detour (0.4 miles)​. Route 4019 bridge will be under a single-lane restriction with traffic signal
  • Construction Timeframe: June 2026 to September 2027​
  • Detour Implementation Date: June 22, 2026
  • Anticipated Date Detour to be Lifted: October 31, 2026
  • Detour Route:  Ott Road detour will use Route 4019 (Reynoldsdale Road), Route 4009 (William Penn Road)  
  • Contractor: George S. Hann & Sons, Inc., Littleton, Pa.
  • Current Contract: $817,457.48

View Route 4019 Detour Map (PDF)

Cambria County

Route 756 - Lambert Avenue to Industrial Park Road 

  • Scope: Resurfacing (2.4 miles), drainage upgrades, sight distance improvements, turn lanes, traffic signal upgrades, and pedestrian accommodations
  • Traffic Control: Daylight and nighttime flagging, US 219 ramps and Route 756 nighttime detours, various sideroad detours during certain construction phases
  • Construction Timeframe: April 2026 – October 2027
  • Contractor: A. Liberoni, Inc.
  • Current Contract: $ 9,473,117

View Route 756 Lambert Ave. to Industrial Park Road Detour Maps (PDF)

UPDATE: Detour scheduled for Monday, June 22, with Tuesday, June 23 as backup date. Detour route is Map 1 "T-805 (Vo Tech Drive) Weekend Detour Route" from PDF map link above.

Route 160 Conemaugh River Culvert

  • Scope: Bridge Replacement
  • Traffic Control: Detour (12.1 miles)
  • Construction Timeframe: March - July 2027
  • Anticipated Detour Implementation Date: June 6, 2027
  • Anticipated Date Detour to be Lifted: June 23, 2027
  • Contractor: Cottle’s Asphalt Maintenance, Inc.
  • Current Contract: $ 1,358,370

View Route 160 Conemaugh River Culvert Detour Map (PDF)

Fulton County

  • Scope: Bridge Replacement (T-313 over Tributary to Sawmill Hollow Run), Single-Cell Precast Concrete Box Culvert, Rip Rap Protection, Minor Approach Roadway Work
  • Traffic Control: Detour – 9.69 Miles
  • Detour Route: Route 301 (Hill Road) detour uses Route 484 (Buck Valley Road) and Route 3003 (Stoneybreak Road)
  • Anticipated Detour Timeframe: August – September 2026
  • Construction Timeframe: April 2026 – November 2026
  • Contractor: George S. Hann & Sons, Inc.
  • Current Contract: $1,017,000

 

View T-313 Sawmill Hollow Route 301 (Hill Road) Detour Map (PDF).


  • Scope: Bridge Replacement over McKees Run, guide rail updates, approach roadway improvements
  • Traffic Control: Detour – 4.63 Miles 
  • Detour Route: T-330 (Zachs Ridge Road) detour will use Route 731 (Fairview Road/McKees Gap Road).
  • Anticipated Detour Timeframe: August – September 2026
  • Construction Timeframe: April 2026 – November 2026​
  • Contractor: Wen-Brooke Contracting Inc. 
  • Current Contract: $776,084

View T-330 (Zachs Ridge Road) Detour Map (PDF) 

Route 655 (Thompson Road) over Barnetts Run Bridge Improvement Project

  • Scope: Bridge superstructure replacement (2-span T-beam), roadway reconstruction at approaches, milling and paving, guide rail replacement​
  • Construction Timeframe: July 2026 – September 2027
  • Traffic Control: Detour – 16.38 Miles, mostly during school recess​
  • Anticipated Detour Timeframe: July 27 to October 12, 2027
  • Detour Route: From Route 655 (Thompson Road) in Needmore, use Route 522 (Great Cove Road) to Route 484 (Buck Valley Road) in Warfordsburg, continuing on Route 484 (Pigeon Cove Road/Stillwell Road) in Bethel Township back to Route 655 (Thompson Road) in Thompson Township.
  • Detour Length: 16.2 miles
  • Contractor: George S. Hann & Sons, Inc.
  • Current Contract: $834,000

View the Route 655 (Thompson Road) over Barnetts Run Bridge Improvement Project Detour Map (PDF)

Huntingdon County

Somerset County

​

  • Scope: Bridege Rehabilitation ​
  • Traffic Control: Detour (4.7 miles)​
  • Construction Timeframe: April to November 2026
  • Detour Implementation Date: April 6, 2026 
  • Anticipated Date Detour to be Lifted: August 2026
  • Contractor: New Enterprise Stone & Lime, New Enterprise, Pa.
  • Current Contract: $24,600,000

 

View T-685 Miller Road Bridge on US 219 Somerset Co Detour (PDF).

 

 

 

 




​

Route 7209 T-364 (Jimtown Road) Gardner Bridge over Laurel Creek

  • Scope: Bridge Replacement
  • Location: Jefferson Township
  • Traffic Control: Detour (4.2 miles)
  • Construction Timeframe: April – June 2027
  • Anticipated Detour Implementation Date: Bridge currently closed
  • Anticipated Date Detour to be Lifted: Spring 2027
  • Detour Route: T-364 (Jimtown Road), Route 3037 (Trent Road), Route 31 (Glades Pike) 
  • Contractor: Plum Contracting, Inc.
  • Current Contract: $ 1,284,360

View Route 7209 T-364 Jimtown Road Gardner Bridge Detour

22nd Street Bridge Rehabilitation over Seese Run

  • Scope: Bridge Rehabilitation 
  • Traffic Control: Detour 
  • Construction Timeframe: November 2026 to October 2027
  • Anticipated Detour Implementation Date: November 14, 2026​
  • Anticipated Date Detour to be Lifted: October 26, 2026​
  • Detour Route: Graham Avenue, 24th Street, and Stadium Drive. 
  • Contractor: Merlo Construction, Mineral Point, Pa.
  • Current Contract: $ 547,000