Project Status
Step 2 of 4
Design
Next Step: Construction
Public Outreach
Virtual Plans Display
The virtual plans display will be available online from January 5, 2025 through January 19, 2025.
Public Comment Period
The public comment period, where the community is encouraged to respond with questions and concerns will be from January 5, 2026 through January 19, 2026.
Project Overview
County: Fayette
Municipality: South Union Township
State Route: T-445, Route 2025, T-618, Barton Mill Rd.
Local Name: Stadium Dr., Redstone Furnace, Township Dr., Barton Mill Rd.
Project Type: Bike/Ped Facility
MPMS Number: 121431
Proposed Construction Start: Summer 2026
Proposed Construction End: Summer 2026
Last Updated: 01/05/2026
The project is to install flashing warning signs and advanced warning signs at four existing Sheepskin Trail Crossing locations within South Union Township. The signs are to increase visibility of the trail and motorist awareness. Construction is anticipated to occur in the summer of 2026 and will take approximately two weeks.
Contact Information
Brandon J. Kalp
Project Manager
724-237-6145
c-bkalp@pa.gov
Andrew Stacy
General Inquiries
724-415-3710
anstacy@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.