Project Status
Step 3 of 4
Construction
Next Step: Completed
Project Overview
County: Butler
Municipality: Butler and Summit Townships
State Route: Route 68 and Route 422
Project Type: Bridge Replacement
MPMS Number: 86105
Construction Start: December 2024
Construction End: May 2028
Cost: $64,846,663
Contractor: Swank Construction Company
Last Updated: 2/13/2026
The Karns Crossing Bridge is a key connector between east Butler and the Route 422 interchange. Route 68 provides north/south access to the Route 68/Route 422 interchange and direct access to the Butler Health System Memorial Hospital. The Karns Crossing Bridge project will replace two separate structures. The first is the bridge itself that carries Route 68 over the railroad lines. The second structure is the adjacent arch culvert over the waterway.
The new Karns Crossing Bridge will be widened from 2-lanes to 4-lanes with wider shoulders and will be raised to provide clearance over the rail lines for double stack rail cars, removing a freight bottleneck and increasing the volume of goods moved per train. The existing arch culvert over the Connoquenessing Creek will be replaced with a single span bridge. The new bridge will also be wider than the existing one to allow 4 lanes on Route 68.
The project includes traffic safety and capacity improvements at the Route 68/Delwood Road intersection and the Route 68/Route 422 eastbound on-ramp intersection.
Phase 2 began in November of 2025 and includes building a new three span structure to replace the Karns Crossing Bridge over the Buffalo & Pittsburgh and Bessemer & Lake Erie Railroads. Also, the existing twin arch culvert will be replaced with a single span structure currently located near the intersection of Route 422 interchange. Several phase changes are to occur in the Summer of 2025 to perform roadway work near the interchange of Route 422 Eastbound on and off ramps for the new structures. The new bridges are expected to be open to half width construction in November of 2025, while the other portion of the structures will be built in 2027. Nighttime road restrictions under flagger are expected throughout the summer of 2025 for beam erection and delivery along with roadway work.
Location Map
Contact Information
Stephen Headley
Project Manager
724-256-8693
sheadley@pa.gov
Tina Gibbs
Press Office
724-357-2829
chgibbs@pa.gov
Project Updates & Press Releases
-
08/28/25 Extension of Traffic Restrictions on the Karns Crossing Bridge Replacement Project
-
07/28/25 Temporary Roadway Work Begins on the Karns Crossing Bridge Replacement Project
-
04/07/25 Utility Relocation Begins April 11 on East Jefferson Street for the Karns Crossing Bridge Replacement Project
-
03/31/25 Delwood Road Closure Begins April 1 as the Karns Crossing Bridge Replacement Project Begins Construction
-
03/13/25 Tree Trimming Activities Beginning Along Route 68 for the Start of the Karns Crossing Bridge Replacement Project
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.