Project Status
Step 2 of 4
Design
Next Step: Construction
Public Outreach
Public Meeting
A public meeting featuring a public plans display and project presentation will take place:
Date: September 9
Time: 7:00 PM
Location: Lake Township Building is located at 488 State Route 29, Harvey's Lake, PA 18618.
Public Comment Period
The public comment period, where the community is encouraged to respond with questions and concerns will be from August 15, 2026 through October 1, 2026.
Project Overview
County: Luzerne
Municipality: Lake Township
State Route: 29
Local Name: Memorial Highway
Project Type: Structure Repalcement
MPMS Number: 67391
Proposed Construction Start: Spring 2028
Proposed Construction End: Fall 2028
Last Updated: August 11, 2026
The Pennsylvania Department of Transportation (PennDOT) invites the public to view public plans displays regarding the Route 29, Section 358 Structure Replacement Project over Pike’s Creek. This project will be introduced during the Lake Township Board of Supervisors monthly meeting on September 9, 2026, beginning at 7:00 PM. The Lake Township Building is located at 488 State Route 29, Harvey's Lake, PA 18618.
The purpose of the project is to provide a sustainable crossing over Pike’s Creek that provides a two-lane bridge, addresses structural and hydraulic deficiencies of the existing structure, and provides continued access to local residents, businesses, and emergency services.
The project consists of the replacement of the existing reinforced concrete slab bridge with a precast concrete box culvert. The permanent approach roadway work will include tie-ins with the existing roadway. Stream restoration work will be completed upstream and downstream of the proposed structure to address streambed stability and sediment transport issues. Additionally, guide rail upgrades and drainage channel improvements within the project limits will be incorporated into the project. Two utility pole relocations are expected to be necessary to construct the project.
A detour will be required to perform the proposed work. Route 29 car and truck traffic will be detoured using all state roads. The car traffic will use a 5.8-mile detour including Maple Tree Rd (Route 1032), Church Rd (Route 1030) and Tulip Rd (Route 1065). The truck traffic will use a 17.0-mile detour including Route 118, Route 415, and Route 309. It is anticipated that the detour will be in place for the duration of the project.
It is anticipated that construction will begin in the spring/summer of 2028 and will be complete by the fall of 2028.
The public plans display materials will be online and will be available from August 15, 2026, to October 1, 2026.
The purpose of the plans display is to introduce the project, display and describe the planned detour, and receive public input regarding questions or concerns with the project. The public is encouraged to respond to the public questionnaire and provide comments by clicking on the Comment Form above.
The project documents can be made available in alternative languages or formats if requested. If you need translation/interpretation services or have special needs or have special concerns that require individual attention, contact Amy Lolli, PennDOT Project Manager, at 570-614-2958 or amlolli@pa.gov.
Additional Project Information
Detour Information
Car Traffic:
From points North of the bridge, head north along Route 29 for 2.4 miles towards Route 6. Turn right onto Tulip Rd (Route 1065) and travel 1.4 miles. Turn left onto Church Rd (Route 1030) and travel 1.2 miles. Turn right onto Loyalville Rd (Route 1032) and travel 2.2 miles. Continue straight onto Hickory Tree Rd (Route 1057) and travel 350 ft. Turn right onto Maple Tree Rd (Route 1032) and travel for 1.0 mile. Turn left on Route 29. End of detour.
From points south of the bridge, head south along Route 29 for 1.2 miles towards Route 118. Turn left onto Maple Tree Rd (Route 1032) and travel 1.0 miles. Turn left onto Hickory Tree Rd (Route 1057) and travel 350 ft. Continue straight onto Loyalville Rd (Route 1032) and travel 2.2 miles. Turn left onto Church Rd (Route 1030) and travel 1.2 miles. Turn right onto Tulip Rd (Route 1065) and travel 1.4 miles. Turn right onto Route 29. End of detour.
Truck Traffic:
From points North of the bridge, head north along Route 29 9.9 miles towards Route 6. Turn right onto Route 309 and travel 8.3 miles. Turn right onto Route 415 and travel 2.2 miles. Turn left onto Route 118 and travel 7.1 miles. Turn left on Route 29. End of detour.
From points south of the bridge, head south along Route 29 for 3.6 miles towards Route 118. Turn left onto Route 118 and travel 7.1 miles. Turn right onto Route 415 and travel 2.2 miles. Turn left onto Route 309 and travel 8.3 miles. Turn right onto Route 29. End of detour.
Contact Information
Amy Lolli
Project Manager
amlolli@pa.gov@pa.gov
Jessica Ruddy
Community Relations Coordinator
jeruddy@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.