Project Status

Step 2 of 4

Design

Next Step:  Construction

Public Outreach

Virtual Plans Display

​The virtual plans display will be available online from July 27, 2026 through August 10, 2026

Public Comment Period

The public comment period, where the community is encouraged to respond with questions and concerns will be from July 27, 2026 through August 10, 2026.

Project Overview

County: Warren
Municipality: Eldred Township
State Route: 0027
Local Name: Route 27
Project Type: Bridge Replacement
MPMS Number: 2477
Proposed Construction Start: 2027
Proposed Construction End: 2027
Last Updated: 07/23/2026

This is a proposed project to replace the bridge that carries Route 27 over Caldwell Creek in Eldred Township, Warren County.

The bridge is located on Route 27 between the intersection with Star Hill Road and the intersection with Newton Sanford Road, approximately 6.3 miles south of the intersection with Route 426.

The existing bridge will be replaced with a new concrete structure with 11-foot travel lanes and 4.5-foot shoulders. Approximately 190 feet south and 155 feet north of the bridge will be reconstructed to match the elevation of the new bridge. In addition, private driveways and the existing roadside ditch will need to be adjusted as needed.

The project also includes upgrading guide rail and new road paint.

Work is expected to occur during the 2027 construction season.

The existing reinforced concrete bridge was built in 1930. It is classified as poor condition. Approximately 1,375 vehicles a day use the bridge, on average. 

Map showing the location of the Route 27 bridge

Traffic Impacts

Plans call for the bridge replacement to be completed using phased construction that maintains one-lane open with traffic controlled by flaggers.

Contact Information

Brody Guth
Project Manager
814-678-7355
brguth@pa.gov

Jill Harry
Media Contact
814-678-5035
jharry@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.