Project Status
Step 2 of 4
Design
Next Step: Construction
Public Outreach
Virtual Plans Display
The virtual plans display will be available online from May 6, 2026 through June 5, 2026.
Public Comment Period
The public comment period, where the community is encouraged to respond with questions and concerns will be from May 6, 2026 through June 5, 2026.
Project Overview
County: Armstrong
Municipality: Kittanning
State Route: 2008
Local Name: Red Mill Road
Project Type: Replacement
MPMS Number: 91803
Proposed Construction Start: 04/01/2028
Proposed Construction End: 10/31/2028
Last Updated: 05/06/2026
The project consists of replacing the existing structure carrying Route 2008 (Red Mill Road) over Mill Run. The replacement structure will be a single span bridge constructed on the same alignment as the existing structure with mimimal roadway approach work. Traffic control during construction will utilize a detour.
Contact Information
Patrick Hoffman, PE
Project Manager
724-357-2964
patrihoffm@pa.gov
Tina Gibbs
Press Office
724-357-2829
chgibbs@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.