Project Status
Step 2 of 4
Design
Next Step: Construction
Public Outreach
Virtual Plans Display
The virtual plans display will be available online from August 19, 2025 through September 19, 2025.
Public Comment Period
The public comment period, where the community is encouraged to respond with questions and concerns will be from August 19, 2025 through September 19, 2025.
Project Overview
County: Lebanon
Municipality: Union Township
State Route: 72-067
Local Name: Ebenezer Road
Project Type: Culvert Replacement
MPMS Number: 117412
Proposed Construction Start: June 2026
Proposed Construction End: September 2026
Last Updated: August 2025
The Pennsylvania Department of Transportation (PennDOT) invites the public to an online plans display for Ebenezer Road (Route 72, Section 067) arch culvert preservation project located over a tributary to Swatara Creek. The project is located approximately 0.6 miles south of West Jonestown and 0.6 miles north of Bunker Hill in Union Township, Lebanon County.
The purpose of this project is to rehabilitate the existing arch culvert carrying an unnamed tributary to Swatara Creek under Route 72 and provide scour protection.
The project includes removing material within the culvert barrel as well as in front of the wing walls. Scour protection will be placed to protect the existing footings of the arch culvert. Additionally, the interior of the culvert and the exposed surfaces of the headwalls show signs of deterioration. The interior of the culvert barrel and the inlet and outlet sections will be rehabilitated with concrete repairs, crack sealing and concrete protective coatings. No roadwork or guide rail work is proposed for this project.
Traffic Control for this project is anticipated to include short-term lane closures and flagging. Lane closures will be utilized as needed when relocating materials/equipment to the inlet or outlet ends of the culvert.
The project is currently in design and construction work is expected to take place in the 2026 construction season. The duration of construction is anticipated to last 3-4 months.
A digital version of the project plans and information will be available to view online through September 19, 2025.
Contact Information
Adrian Fogle
Project Manager
717-363-2817
c-adrfogle@pa.gov
David M. Thompson
Media Contact
(717) 787-1446
dmthompson@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.