District 1 Projects - Erie County

Sassafras Pedestrian Bridge over the Bayfront Parkway

Project Status

Step 2 of 4

Design

Next Step:  Construction

Public Outreach

Public Open House

An open house public meeting featuring a public plans display will take place:

Date: December 8, 2026
Time: 4:00 PM to 6:00 PM
Location: Erie Convention Center, 1 Sassafras Pier, Erie PA 16507

Virtual Plans Display

​The virtual plans display will be available online through December 22, 2026. 

Public Comment Period

The public comment period, where the community is encouraged to respond with questions and concerns, will be open through December 22, 2026. 

Project Overview

County: Erie
Municipality: Erie
State Route: N/A
Local Name: Sassafras Street
Project Type: Pedestrian Bridge
MPMS Number: 116144
Proposed Construction Start: Fall 2027
Proposed Construction End: Fall 2028
Last Updated: 11/24/2026

The proposed Sassafras Pedestrian Bridge will provide a grade-separated crossing over Bayfront Parkway (Route 4034) leading from Sassafras Street at the top of the bluff to Sassafras Street Extension at the northern side of the parkway just east of the roundabout.

This bridge will allow users to navigate the previously impassable 40+ foot grade change between the two landing points. The route will be ADA accessible, providing users with stairs, a switchback, and an elevator. Safety considerations include clear sightlines, integrated lighting, and handrails throughout.

This project will also feature a lookout towards the waterfront.

The bridge and stairs are 14 foot wide, comfortably accommodating two-way foot traffic and event surges. Bike runnels (shallow channels at the center of each stair run) will permit cyclists to dismount and lead their bikes up or down.

The curving alignment and varying arch ribs will create a dynamic structural form visible from vantage points both below and above the bridge.

This new piece of infrastructure will provide a key connector for communities on the above the bluff and the waterfront side of the Bayfront Parkway. 

Map showing the location of the proposed pedestrian bridge

Traffic Impacts

Impacts to traffic on the Bayfront Parkway are expected to be minimal and limited to weekend and/or overnight closures. Short-term detours of the Bayfront Parkway using Route 5 will be implemented during these times.

Temporary impacts to the Bayfront Promenade and Bayfront Bikeway are anticipated. Short-term detours of these paths will be implemented using West Front Street and West Second Street. The public will be notified prior to the implantation of any detours. 

Preliminary bridge plans

Section 4(f)

The Bayfront Promenade, located along the bluffs south of the Bayfront Parkway, is a public space that includes a multi-use path, park improvements, and interpretive exhibits. Temporary occupancy of the Bayfront Promenade is anticipated during construction of the proposed pedestrian bridge; therefore, a Determination of Section 4(f) Applicability Involving Temporary Occupancy form is anticipated.

Additionally, the Bayfront Bikeway, which is part of the 518-mile Great Lakes Seaway Trail, is located on the north side of the Bayfront Parkway. Similar to the Bayfront Promenade, temporary occupancy of the Bayfront Bikeway is anticipated during construction of the proposed pedestrian bridge and as a result a Determination of Section 4(f) Applicability Involving Temporary Occupancy for is anticipated.

Contact Information

Mark Nicholson
Project Manager
814-678-7057
manicholso@pa.gov

Jill Harry
Press Officer
814-678-5035
jharry@pa.gov

Related Projects

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.