Project Overview

County: Allegheny
Municipality: City of Pittsburgh
State Route: Interstate 376
Local Name: I-376
Project Type: Drainage Improvement
MPMS Number: 112249
Proposed Construction Start: October 2026
Proposed Construction End: Fall 2027
Last Updated: 09/25/2026

This $14.34 million project along westbound I-376 (Parkway East) within the City of Pittsburgh will include work to reconstruct and raise 1,150 feet of existing floodwall to reduce the frequency of flooding events between the Grant Street (Exit 71A) interchange and the Fort Pitt Bridge. Work includes the installation of micropiles to strengthen the existing structural foundation under the roadway, full pavement replacement, and repairing and upgrading the existing pump and piping systems. A long-term single-lane restriction and ramp closures, as well as Mon Wharf parking area impacts, will be in place for majority of the project with possible weekend closures and lane restrictions. During the 2027 construction season, travelers can expect a 12-day full closure and detour of westbound I-376 for full-width concrete pavement reconstruction. The overall project is expected to conclude in the fall of 2027. Golden Triangle Construction Company is the prime contractor.

The “bathtub” area of the Parkway East, lies between the Monongahela River and downtown Pittsburgh. This segment of the three-lane highway (two through lanes and one auxiliary exit lane) is roughly 5 feet higher than the normal river stage of 16 feet and is currently protected by a variable height floodwall with a minimum height of approximately 4 feet at the sump pump locations. The "bathtub" has experienced increased closures due to flooding over the past decade. Each closure diverts approximately 43,000 vehicles and costs a significant amount of money and time to allow crews to conduct clean-up activities once the river recedes, which includes pumping the water and cleaning out mud and debris from the area in order to reopen the road. This project aims to reduce the frequency of flooding events and improve maintenance response time afterwards. 

 

Project Animation

View the video animation below for an overview of the project, including an artist rendering of what to expect.

Project Location

Contact Information

Jarod Grafton, P.E.
Project Manager
412-429-4906 
jgrafton@pa.gov

Mark Young
Environmental Planning Manager
412-429-4858
markyoung@pa.gov

Nicole Haney
Media Contact
412-429-5011
nhaney@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.