Project Overview

County: Lancaster
Municipality: Strasburg Township
State Route: Route 2015
Local Name: May Post Office Road over Unnamed Tributary to Little Beaver Creek
Project Type: Culvert Replacement
MPMS Number: 117414
Proposed Construction Start: May 2027
Proposed Construction End: September 2027|
Last Updated: October 2025

The May Post Office Road culvert replacement project is located along May Post Office Road over an Unnamed Tributary to Little Beaver Creek in Strasburg Township, Lancaster County. The purpose of the project is to replace the existing culvert pipe array. 

The existing structure was built in 1976 and consists of three corrugated metal pipes.  The overall structure length is approximately 19 feet-0 inches.

The existing pipe array will be replaced with a buried precast concrete box culvert with precast end sections. Additional work includes utility relocations, reconstruction of the pavement within the project limits, minor roadway geometric adjustments, guide rail upgrades, and rock placement around the wing walls for scour protection. The roadway width over the proposed culvert is 30 feet-0 inches between faces of guiderail. 

This section of May Post Office Road carries a daily traffic volume of 5,209 vehicles per day. Environmental activities completed include a wetlands study, environmental due diligence form, and an historic eligibility survey for one property.

The proposed construction schedule is approximately 6 months with the bridge closed to traffic. The proposed 3.7-mile detour will utilize Weaver Road, Bunker Hill Road and Shaub Road. Access to all driveways within the project limits will be maintained during construction. 

Current construction cost is estimated to be approximately $862,000.

Detour Information

Please see the Detour Plan under resources at the top of this page.

Contact Information

Diane Crispino
Project Manager
717-540-6040  
c-dcrispin@pa.gov

David M. Thompson
Media Contact
(717) 787-1446
dmthompson@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.