Project Status
Step 4 of 4
Completed
Project Overview
County: Chester County
Municipality: West Whiteland Township
State Route: U.S. 30
Local Name: Exton Bypass
Project Type: Sinkhole Remediation
MPMS Number: 104807
Last Updated: October 2026
This federally-funded project involved permanent repairs to sinkholes at two spots along U.S. 30 (Exton Bypass), between the U.S. Business 30 (Lancaster Avenue) interchange and Clover Mill Road. In addition to fixing the sinkholes, nearby drainage basins were improved to help prevent future issues.
The work area stretched along U.S. 30 (Exton Bypass) from about three-quarters of a mile west of the Clover Mill Road bridge to about a quarter of a mile east of the bridge, in West Whiteland Township.
The goal of the project was to address sinkhole activity and ensure smooth and safe traffic flow on U.S. 30 (Exton Bypass).
In addition to the sinkhole repair, PennDOT added resurfacing work using state funding to address the pavement concerns along the eastern end of U.S. 30 in Chester County.
PennDOT's contractor resurfaced approximately 2.3 miles of eastbound U.S. 30 (Coatesville Downingtown Bypass) between U.S. 322 (Horseshoe Pike) to just past the Route 113 (Uwchlan Avenue). The resurfacing work began on Tuesday, September 8, with milling operations. Nighttime lane closures were in place on sections of the corridor as the contractor worked to mill and pave U.S. 30 East (Coatesville Downingtown Bypass).
PennDOT announced on Friday, October 9 that work on this project, including the added resurfacing work, has been completed.
Construction/Traffic Update
Construction began on Monday, September 29, 2025, on the $6.8 million project to provide long-term sinkhole remediation on U.S. 30 (Exton Bypass) in West Whiteland and East Caln townships, Chester County.
Drivers encountered weekday lane closures from 9:00 AM and 3:00 PM through fall 2026, on U.S. 30 (Exton Bypass) between Route 100 (Pottstown Pike) and Business U.S. 30 (Lancaster Avenue).
PennDOT announced on Friday, October 9 that work on this project, including the added resurfacing work, has been completed.
Contact Information
Justin Gattorno
Project Manager
jgattorno@pa.gov
Brad Rudolph
Media Contact
(610) 205-6800
brrudolph@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.