Project Status
Step 2 of 4
Design
Next Step: Construction
Project Overview
County: Lackawanna
Municipality: Scott Township
State Route: 1029
Local Name: Green Grove Road
Project Type: Bridge Rehabilitation
MPMS Number: 122520
Proposed Construction Start: June 2027
Proposed Construction End: September 2027
Last Updated: August 6, 2026
The Pennsylvania Department of Transportation (PennDOT) invited the public to a virtual plans display regarding Route 1029, Section PRS Green Grove Road over Hulls Creek Bridge project, Lackawanna County. The purpose of this project is to rehabilitate the stone masonry abutment and wingwalls for the Route 1029 (Green Grove Road) Bridge over Hull Creek. The plans will be developed to address the bulging in the stone masonry walls and to improve the conditions behind the walls to facilitate drainage. A geosynthetic stabilized bridge approach (GSBA) will be constructed behind the abutments and wingwalls. The project also includes scarification of the existing concrete bridge deck, full depth paving over the GSBA, and milling and overlay on sections of the approaches.
Additional Project Information
A detour for Route 1029 (Green Grove Road) will be required to perform the proposed work. Route 1029 traffic will use a 3.9-mile detour using state, including: Route 347 (Justus Boulevard), Route 1027 (Layton Road, and Route 632 (Commerce Drive). The detour is expected to last approximately four (4) months during construction.
Contact Information
Laury Estevez De Jesus
Project Manager
lestevezde@pa.gov
Jessica Ruddy
Community Relations Coordinator
jeruddy@pa.gov
Public Outreach
Public Meeting
A public meeting featuring a public plans display and project presentation took place on August 18, 2026 at 6:30 PM at the Joe Terry Civic Center, 1038 Montdale Road, Scott Township, PA 18447
Virtual Plans Display
The virtual plans display was available online from August 18, 2026 through September 1, 2026.
Public Comment Period
The public comment period, where the community was encouraged to respond with questions and concerns was from August 18, 2026 through September 1, 2026.
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.