PA 61 St. Clair to Frackville Reconstruction

Project Status

Step 3 of 4

Construction

Next Step:  Completed

Project Overview

County: Schuylkill
Municipality: St. Clair, Frackville boroughs; New Castle, Blythe, West Mahanoy townships
State Route: 0061
Local Name: PA 61 
Project Type: Roadway Reconstruction
MPMS Number: 96470
Proposed Construction Start: Spring 2024
Proposed Construction End: February 2029
Last Updated: Septmeber 2025

The Route 61 project includes full depth pavement reconstruction, safety improvements including realignment of several substandard curves, heavy excavation, intersection upgrades at Darkwater Road, wider shoulders, reconstruction and/or rehabilitation of eight culverts and four retaining walls, a bridge, slope stabilization, message boards, sign structures, ADA curb ramps and miscellaneous construction.

The project also includes upgrading the Route 61 intersection with Darkwater Road in New Castle Township. This intersection will be widened, turning lanes will be added, and a traffic signal will be added.

J.D. Eckman, Inc. of Atglen, PA is the contractor on the $115,574,431.25 project.

Contact Information

Christine Arthur
Administrative Assistant for Construction
610-871-4435
charthur@pa.gov

Sean Brown
Safety Press Officer
610-871-4556
sebrown@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.