Project Status
Step 1 of 4
Design
Next Step: Construction
Public Outreach
Public Meeting
A public meeting featuring a public plans display and project presentation will take place:
Date: Wednesday, August 12, 2026
Time: 6:00 PM to 7:00 PM
Location: Snyder Township Building, 108 Baughman Hollow Road, Tyrone, Pa.
Project Overview
County: Blair
Municipality: Snyder Township
State Route: 4023
Local Name: Tipton Road
Project Type: Bridge Rehabilitation
MPMS Number: 22127
Proposed Construction Start: April 2028
Proposed Construction End: September 2029
Last Updated: July 2026
The Pennsylvania Department of Transportation (PennDOT) is developing plans for the Route 4023 (Tipton Road) over Three Springs Run bridge replacement project in Snyder Township, Blair County.
The Route 4023 (Tipton Road) over Three Springs Run bridge replacement project will include the complete replacement of existing reinforced concrete slab bridge with a reinforced concrete box culvert, minor approach paving and guide rail updates. A detour will be in effect for the duration of construction to allow the contractor full access to the structure.
Project Detour Information
Contact Information
James F. Bittner, Jr.
Project Manager
814-696-7184
jambittner@pa.gov
Jay Knarr
Press Contact
814-696-7101
jaknarr@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.