Bigelow Boulevard Betterment

Project Status

Step 2 of 4

Design

Next Step:  Construction

Public Comment

The community is encouraged to view the project presentation and other information under the Resources menu of this page and submit questions and comments using the button below. 

Project Overview

County: Allegheny
Municipality: City of Pittsburgh
State Routes: 400 and 2146
Local Name: Bigelow Boulevard
Project Type: Resurfacing, Restoration, and Rehabilitation (3R)
MPMS Number: 109383
Proposed Construction Start: Spring 2027
Proposed Construction End: 2027
Last Updated: 12/18/2025

The Bigelow Boulevard Betterment Project consists of a roadway resurfacing and structure rehabilitation from the Route 579 interchange to the Bloomfield exit in the City of Pittsburgh, Allegheny County. Bigelow Boulevard is a major corridor in the City of Pittsburgh that connects downtown with the surrounding areas to the north and east. Currently, over 21,000 vehicles utilize Bigelow Boulevard each day. The project includes the milling and overlay of existing pavement, removal of the existing barrier and replacement with concrete barriers, drainage upgrades, barrier and guiderail upgrades, improvements to pedestrian facilities including ADA updates and railings, signing and pavement markings, curb repairs, lighting upgrades and repairs to retaining walls and sign structures. Coordination with the City of Pittsburgh provided insight to allow for improvements which will allow for drivers to easily navigate the roadway and provide pedestrians and roadway users better protection from errant vehicles. The project’s structure work includes spall, backwall, overhead substructure, downspout and barrier repairs, sealing of the joints, gutterlines, substructures, decks, and some structures will have full paint. The project is scheduled to start construction in the Spring of 2027, likely concluding near the end of the same year.

Detour Information

Multiple short-term detours are planned during closures of Bigelow Boulevard for structure work. Preliminary planned detour routes utilize Liberty Avenue (approximately 3 miles) and Center Avenue (approximately 2.3 miles).

Contact Information

Justin McCollum, P.E.
Project Manager
412-429-4895
jumccollum@pa.gov

Mark Young
Environmental Planning Manager
412-429-4858
markyoung@pa.gov

Steve Cowan
Press Officer
412-334-5436
stcowan@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.