Project Status
Step 2 of 4
Design
Next Step: Construction
Public Outreach
Virtual Plans Display
The virtual plans display will be available online from November 3, 2026 through November 24, 2026.
Public Comment Period
The public comment period, where the community is encouraged to respond with questions and concerns will be from November 3, 2026 through November 24, 2026.
Project Overview
County: Armstrong
Municipality: Pine Township
State Route: 1030
Local Name: Ridge Road
MPMS Number: 120768
Project Type: Replacement
Proposed Construction Start: 04/01/2029
Proposed Construction End: 09/30/2029
Last Updated: 11/03/2026
The East of Templeton 1 and 2 Group Bridge replacement consists of the replacement of the existing structures that carry Route 1030 over Wiskey Creek in Pine Township, Armstrong County. The existing structures will be replaced with precast concrete box culverts. Guide rail and pavement markings will also be updated within the project vicinity.
Contact Information
Jared T. Hoover, P.E.
Project Manager
724-427-3541
jarehoover@pa.gov
Tina Gibbs
Media Contact
724-357-2829
chgibbs@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.