At a press conference today, Pennsylvania Department of Transportation (PennDOT) District 9, encompassing Bedford, Blair, Cambria, Fulton, Huntingdon, and Somerset counties, highlighted $210 million in transportation investments during the 2026 construction season in the Laurel Highlands Region.
“Year after year, we look forward to the opportunity to present this review of completed and ongoing construction projects to the traveling public,” District 9 Executive Vince Greenland said. “These projects represent our unwavering commitment to designing, building and maintaining the roads and bridges that carry District 9 residents and travelers across Pennsylvania safely and efficiently to their destinations.”
Under the Shapiro Administration, more than 23,100 miles have been improved statewide, and work has advanced on over 2,100 state and local bridges.
Between January and October of this year, PennDOT has improved 3,992 miles of road, including 1,231 miles of paving, and work advanced on 506 state and locally owned bridges.
As part of the final 2026-27 state budget, the Shapiro Administration will drive out $775 million from the Motor License Fund over the next 18 months for shovel-ready projects to repair state-owned roads across Pennsylvania.
There will be more than 400 miles of paving to 44 counties because of this funding. These Rapid Deployment Projects will begin early, helping to reduce ongoing maintenance costs, prevent further road deterioration, and free up resources like crews and equipment for use in other projects.
Overall highlights in the 2026 construction season for District 9 include:
- Approximately 169 miles of road paving.
- Approximately 395 miles of seal coating and road maintenance.
- 86 bridges were repaired or replaced.
As of November 24, District 9 has awarded 51 construction contracts totaling $129 million to strengthen and modernize infrastructure across the Laurel Highlands region. By the end of the year, an additional 3 contracts are expected to be bid, representing an estimated $13 million in new investments. In total, District 9 anticipates delivering 54 contracts in 2026, with a combined construction value of approximately $142 million.
Notable projects completed in District 9 include:
Bedford County
- U.S. 30, Scenic Road to Pitt Street resurfacing in Bedford Borough, $6.2 million.
- Route 4009 (William Penn Road), Quaker Valley Road to Brumbaugh Road resurfacing in Bedford and Saint Clair townships, $1 million.
Blair County
- Route 3013 (Dunnings Highway) over Dry Run and Blair Gap Run bridge replacements in Blair and Allegheny townships, $5.2 million.
- Route 866 (High Street & Piney Creek Road), Williamsburg Resurfacing in Woodbury Township and Williamsburg Borough, $2.7 million.
Cambria County
- U.S. 22, Route 164 to Blair County Line resurfacing in Cresson and Munster Townships, $12.0 million.
- Route 3104 (Mount Airy Drive) over U.S. 219 bridge replacement in Richland Township, $2.3 million.
- Route 160 over Otto Run and South Fork Branch bridge replacements in Adams and Croyle townships, $3.5 million.
Fulton County
- Interstate 70 eastbound resurfacing, Amaranth to Bedford in Bethel, Brush Creek, and Union townships, $20 million.
- Interstate 70, Amaranth to Maryland line resurfacing in Bethel and Union townships, $13.2 million.
- T-313 (Hill Road) over Tributary to Sawmill Hollow Run bridge replacement, $800,000.
- Route 655 over Barnett’s Run bridge replacement in Belfast Township, $850,000.
Huntingdon County
- Route 655 (Big Valley Pike) over Tributary to Mill Creek culvert replacement in Brady Township, $1.4 million.
- Route 994 (Old Plank Road) over Tributary to Great Trough Creek culvert replacement in Todd Township, $800,000.
- Route 2004 (Meadow Gap Road) over Lick Creek culvert replacement in Springfield Township, $800,000.
Somerset County
- U.S. 219, U.S. 30 to North Somerset resurfacing in Jenner, Lincoln, Quemahoning, and Somerset townships, $26 million.
- U.S. 219 Boynton Bridge Replacement in Elk Lick Township, $2.3 million.
- Route 3029 (Copper Kettle Highway) over Middle Creek bridge replacement in Milford Township, $1.4 million.
- Route 2001 (Oak Dale Road) over Laurel Creek bridge replacement in Elk Lick Township, $1.4 million.
Notable projects continuing into 2027 include:
Bedford County
- U.S. 30, Breezewood to Everett resurfacing in Everett Borough, East Providence Township, and West Providence Township, $14.2 million.
Blair County
- Interstate 99, Sproul/Claysburg to Newry Pulloff resurfacing and bridge rehabilitations in Blair, Freedom, and Greenfield townships, $24 million.
- Route 453 (Jaynesville Pike), Interstate 99 to Beastons Road resurfacing and slope stabilization in Tyrone Borough and Snyder Township, $8.6 million.
- Route 36 (Logan Boulevard), U.S. 22 to Plank Road resurfacing in the City of Altoona, Hollidaysburg Borough, Allegheny Township, Logan Township, and Frankstown Township, $6.3 million.
Cambria County
- Route 756, Alvin Street to Industrial Park Road resurfacing in Geistown Borough and Richland Township, $9.5 million.
Travelers can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,200 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.
Find PennDOT’s planned and active construction projects at www.pa.gov/DOTprojects. Subscribe to PennDOT news and find transportation results in Bedford, Blair, Cambria, Fulton, Huntingdon, and Somerset counties at www.penndot.pa.gov/District9.
Find PennDOT news on X, Facebook, Instagram and LinkedIn.