Project Status
Step 3 of 4
Construction
Next Step: Completed
Project Overview
County: Montgomery
Municipality: Cheltenham Township
State Routes: Route 73, Route 2054
Local Names: Church Road, Greenwood Avenue, Rices Mill Road
Project Type: Intersection Improvements
MPMS Number: 16634
Construction Started: April 2024
Proposed Construction End: September 2027
Last Updated: August 2026
For the most current project status, please see the Fall 2026 Construction Update.
This project is located in Cheltenham Township, Montgomery County, and will improve traffic flow and safety on Route 73 (Church Road) at its intersections with Greenwood Avenue and Rices Mill Road. Proposed project improvements include roadway widening to support left-turn lanes along Route 73 (Church Road) at the intersection of Greenwood Avenue, as well as improvements to Greenwood Avenue near the intersection.
The horizontal curvature along Church Road will also be made less severe to improve visibility and sight distance near the intersection. Coordination with Cheltenham Township has added a sidewalk to the project to provide pedestrian access from the adjacent homes and from Wyncote Elementary School to Curtis Arboretum. Additional project improvements include traffic signal replacements, ADA ramps with new pedestrian crosswalks, the installation of a new drainage pipe and stormwater management system, the replanting of trees within Curtis Arboretum, and the reconstruction of stone walls impacted by the project.
The contractor has substantially completed the stage 1, 2, and 3 work, which included the installation of new drainage systems, curb installation, rebuilt stone walls,s and full-depth roadway reconstruction on Greenwood Avenue, between Church Road and Barker Road, and the westbound side of Church Road from the Rices Mill Road intersection to the Curtis Arboretum entrance.
Over the coming months, the contractor will continue with the reconstruction of the eastbound side of Church Road from Rices Mill Road to the Curtis Arboretum entrance, as well as with the south leg of Greenwood Avenue, between Church Road and Route 309 (Fort Washington Expressway). During this stage, the contractor will also continue with the construction of the new masonry retaining walls adjacent to the Curtis Arboretum, as well as transplanting new, large trees along the frontage of the arboretum. The contractor will also continue with the installation of new storm drainage, curbs and sidewalks, traffic signals, as well as the full-depth pavement reconstruction. The existing long-term detours will remain in place between Easton Road and Washington Lane, and between Township Line Road and Route 309 (Fort Washington Expressway).
Traffic Impacts
Westbound Route 73 (Church Road) and Southbound Greenwood Avenue will remain closed through spring 2027, under a $10.8 million project to improve traffic flow and safety on Route 73 (Church Road) at Greenwood Avenue and Rices Mill Road intersections in Cheltenham Township, Montgomery County.
Motorists are advised of the following travel restrictions:
- Monday, August 17, 2026 through Spring 2027, westbound Route 73 (Church Road) will be closed and detoured 24/7 between Rices Mill Road and the Curtis Arboretum entrance. During the closure, motorists will be directed to use Washington Lane, Route 309 (Cheltenham Avenue), Ogontz Avenue, and Easton Road.
- Monday, August 17, 2026 through Spring 2027, southbound Greenwood Avenue will be closed and detoured 24/7 between Spruce Lane and Barker Road. During the closure, motorists will be directed to use Township Line Road, Washington Lane, Route 309 (Cheltenham Avenue) and Ogontz Avenue.
Motorists are advised to allow extra time when traveling near the work areas because backups and delays will occur.
Access to residences and businesses will be maintained at all times, including Hillcrest Center, Reconstructionist Rabinical College, and Curtis Arboretum.
-
Road Closure Notice (PDF)
-
Fall 2026 Construction Update (PDF)
-
Public Meeting Recording (Video)
-
Project Presentation 2/7/2024 (PDF)
-
Project Presentation (PDF)
-
TIP Visualization Report
-
Plans Display (PDF)
-
Project FAQ (PDF)
-
Advanced Utility Construction Press Release (PDF)
-
Advanced Utility Construction Detour (PDF)
-
Project Landscaping Plan (PDF)
-
Landscaping Plan FAQ (PDF)
-
Press Release 10-3-25
-
View on Interactive Map
Contact Information
Brennan Zymroz
Project Manager
bzymroz@pa.gov
Brad Rudolph
Media Contact
(610) 205-6800
brrudolph@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.