Project Status

Step 2 of 4

Design

Next Step:  Construction

Public Outreach

Public Meeting

A public meeting featuring a public plans display and project presentation will take place at: the regularly scheduled Paradise Township Supervisors’ Workshop on June 16, 2025. 

 

Virtual Plans Display

The virtual plans display will be available online on June 3, 2025. 

Public Comment Period

The public comment period, where the community is encouraged to respond with questions and concerns will be from June 3, 2025 through June 29, 2025. 

Project Overview

County: Monroe
Municipality: Paradise Township
State Route: 1006
Local Name: Red Rock Road
Project Type: Bridge Replacement
MPMS Number: 79203

Proposed Construction Start: Fall 2027
Proposed Construction End: Fall 2028
Last Updated: June 2025

The Pennsylvania Department of Transportation (PennDOT) announces a Plans Display and Project Presentation for the SR 1006, Section 02B Bridge Replacement project. The proposed project involves replacing the open grate structure carrying State Route 1006 (Red Rock Road) over Paradise Creek in Paradise Township with an adjacent box beam bridge.

The horizontal alignment and vertical profile will not change but the bridge will be widened slightly to accommodate pedestrians and a larger water table.  Signs and safety features will be upgraded.  A driveway in proximity to the bridge will be relocated slightly to allow for upgraded safety features and improve sight distance.  The downstream streambank will be fortified to prevent further erosion and sediment deposition will be removed from the stream.   The new piers and abutments will be reoriented to align with the current predominant stream channel flow direction. 

Traffic will be detoured during construction, but local access will be maintained to all properties along Red Rock Road.  No major constructability issues are anticipated.

Individuals or groups with a demonstrated interest within the project limits, surrounding businesses, and local property owners that may be affected by the proposed project are encouraged to review the displays and contact us with any questions.

The purpose of the plans display is to introduce the project and receive public input regarding any questions or concerns with the project. Please provide your question or comments by June 29, 2025.

The project documents can be made available in alternative languages or formats if requested. If you need translation/interpretation services or have special needs or have special concerns that require individual attention, please contact PennDOT Consultant Project Manager Laura Montgomery at c-lmontgom@pa.gov or 717-461-7908.

Contact Information

Laura Montgomery
PennDOT Consultant Project Manager
717-787-5891
c-lmontgom@pa.gov

Ronald J. Young, Jr., M.P.A.
Press Officer
610-871-4555
ronyoung@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.