Route 66 Pavement Preservation Project Remains Active as Superload Travels Through Westmoreland County

Uniontown, PA—Pennsylvania Department of Transportation (PennDOT) District 12 is announcing that the Route 66 Pavement Preservation Project remains active and will continue to move forward as planned as the superload travels through Westmoreland County.

PennDOT District 12, Plum Contracting, Inc., and the superload hauler are coordinating closely as the superload travels through the Route 66 project area.

The routes used for the superload movements are bonded, providing protection for the road should any damage occur as a result of the movement.

Paving repairs and improvements to Route 66 will take place through fall and continue into next construction season. Additional superload movements are anticipated during the winter months, when construction activity is limited.

Current traffic impacts will remain in place through October:

  • Drivers traveling northbound Route 66 will cross over to southbound Route 66 at the Washington Township Fire Department and transition back to the normal traffic pattern at the Beaver Run Road/North Washington Road intersection.
  • Current daily single-lane restrictions controlled by flaggers will continue on Route 66 between Manor Road and the Route 356 split intersection from 6:30 AM until 5:30 PM.

Additional information on the superload movements can be found on PennDOT’s webpage: Slow-Moving Superload Set to Move Through Area Including Armstrong, Westmoreland and Indiana Counties.

Plum Contracting, Inc. will complete improvements along the 10.5-mile corridor that include: milling and paving, full-depth pavement and base repairs, tree trimming, new pavement markings and signage, guiderail updates, drainage improvements, new traffic signals at three intersections (two intersections on Route 66 in Delmont and another signal at the intersection of Route 66 and Route 356) Route 66 and Route 356 will be reconstructed and widen to add a turn lane to accommodate a new traffic signal. New sidewalks, ADA-compliant pedestrian facilities, lighting, and landscaping near Manor Road and East Pittsburgh Street. An infrastructure investment of $12.9 million.

More information is available on PennDOT’s District 12 website under the Projects Near You and select Route 66 Pavement Preservation. The project is anticipated to conclude in the Fall of 2027.

Stay alert and drive cautiously through the work zones—safety is everyone's responsibility.

Travelers can check conditions on major roads by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,200 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts

Find PennDOT’s planned and active construction projects at www.pa.gov/DOTprojects. Subscribe to PennDOT news and find transportation results in Fayette, Greene, Washington, and Westmoreland counties at www.pa.gov/DOTdistrict 12

Find PennDOT news on X, Facebook, Instagram and LinkedIn.

MEDIA CONTACT: Melissa Maczko, mmaczko@pa.gov or 724-415-3748

# # #