District 8 Projects - Lebanon County

N. 7th Street Resurfacing & Intersection Improvement Project

Project Status

Step 2 of 4

Design

Next Step:  Construction

Project Overview

County: Lebanon
Municipality: North Lebanon Township
State Route: 343-006
Local Name: North 7th Street
Project Type: Resurfacing and Intersection Improvement
MPMS Number: 116163
Proposed Construction Start: Spring 2027
Proposed Construction End: Summer 2028
Last Updated: August 2025

PennDOT District 8-0 is currently developing preliminary engineering for the Route 0343, Section 006 (N. 7th St.) Resurfacing and Intersection Improvement Project located in the City of Lebanon, North Lebanon Township, and Swatara Township Lebanon County.

Mill and overlay work begins north of Reinoehl Street in the City of Lebanon for about 80 feet before crossing into North Lebanon Township. Within North Lebanon Township, the work continues approximately 2.18 miles until the border of Swatara Township near the intersection with Heffelfinger Road. The work continues for about 350 feet into Swatara Township to the end of project.

The project involves safety improvements at the intersection of Kimmerlings Road (T-805) and Kochenderfer Road (T-487). Work is anticipated to include the construction of a new roundabout at the, currently side street stop controlled, intersection of Route 0343 and T805/T487. The work will also include drainage improvements and updated signing and pavement markings. The proposed Route 0343 typical section will be comprised of 11-foot travel lanes and existing shoulders with a minimum width of 3 feet. The proposed typical section the roundabout which includes a 45’ central island, 15’ truck apron, and 20’ travel lane with a curbed gutter.

Traffic will be maintained on Route 0343 during construction. Detours for T805/T487 using local collector roadways will be implemented during specific stages of construction. Temporary Construction Easements and Right-of-Way acquisition are anticipated at this time. PennDOT will coordinate directly with impacted property owners. Utilities will be impacted by construction and relocations are being coordinated with facility owners.

The project is currently in preliminary design and construction work is currently anticipated to take place in the 2027 construction season subject to all approvals, environmental clearances, and funding availability. 

Contact Information

Adam L. Wright
Project Manager
717-772-4028
adamwright@pa.gov

David M. Thompson
Media Contact
(717) 787-1446
dmthompson@pa.gov

Past Public Outreach

The virtual plans display and public comment period were held from April 15, 2025 through May 16, 2025. 

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.