Project Status
Step 3 of 4
Construction
Next Step: Completed
Project Overview
County: Lackawanna
Municipality: Moosic and Old Forge Boroughs
State Route: SR 3015. Section 270
Local Name: North Third Street
Project Type: Superstructure Replacement Project
Proposed Construction End: Summer 2025-2026
The project consists of replacing the existing two-span steel I-beam superstructure on the existing bridge over the Lackawanna River in Moosic and Old Forge Boroughs. The permanent approach roadway work will include tie-ins with the existing roadway, concrete curb, and sidewalk replacement. Additionally, guide rail updates, a new concrete bridge barrier to protect pedestrians on the sidewalk from traffic, and new drainage inlets & pipes. There will be three utility poles that will require relocation along with a temporary relocation of the existing waterline which is all necessary to safely construct the project.
Additional Project Information
The purpose of the project is to provide a sustainable crossing over the Lackawanna River that provides a two-lane bridge, addresses structural and hydraulic deficiencies of the existing structure, and provides continued access to local residents, businesses, and emergency services.
Traffic Control & Detours
It is anticipated that construction will begin spring/summer of 2025 and will be complete by the fall of 2026. No work or detours will take place during the winter months of late 2025 - early 2026.
Local traffic to nearby businesses and residences located in between the existing bridge and the intersection of Monroe Street in Old Forge Borough will be maintained utilizing a single-lane pattern with a temporary traffic signal.
A detour for through traffic will be required utilizing all state roads. Route 3015 (Moosic Road) will be closed in between the driveway to the LT Verrastro Property and Monroe Street in Old Forge Borough. The 1.9-mile detour will utilize Route 3013 (Main Street - Old Forge), Route 3019 (Lonesome Road), and Route 3024 (Main Street - Moosic). Emergency Service providers will be permitted full use of Route 3015 (Moosic Road) during the duration of the detour.
Contact Information
Louis Sparacino
Project Manager
(570) 221-4924
c-lspacian@pa.gov
Jessica Ruddy
PennDOT Press Officer
(570) 963-4044
jeruddy@pa.gov
Past Public Outreach (text)
Public Meeting
Public Plans Display was held:
Date: Tuesday, November 14, 2023
Time: 6:30 PM
Location: Old Forge Municipal Building
310 South Main Street
Old Forge, PA
Public Comment Period
The public comment period, where the community was encouraged to respond with questions and concerns, was active from October 30, 2023, through November 28, 2023.
Virtual Plans Display
The virtual plans display is available online to view, but the comment period closed on November 28, 2023.
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.