The Pennsylvania Department of Transportation (PennDOT) today announced that Grannas Brothers Stone and Asphalt Co., Inc., of Hollidaysburg, will restart work beginning Monday, March 6, 2023, on Route 220 between the PA Turnpike and Interstate - 99 Exit 3 (Johnstown Cessna), in Bedford County, for cable barrier installation in the median.
Traffic will be temporarily reduced to a single lane northbound and southbound in the work zone. No overnight lane restrictions are planned. Motorists are advised to use caution and watch for construction personnel and vehicles.
Remaining work for 2023 includes guide rail and drainage upgrades, cable median barrier installation, and repairs to several bridges.
The overall project consists of pavement preservation work on approximately 31.5 miles of Route 220 and I-99, along with all interchange ramps within the project limits, in both Bedford and Blair Counties. The project will run on Route 220 and on I-99 starting at the PA Turnpike heading north to the beginning of I-99 at Exit 1 (Bedford/Turnpike) through to Exit 15 (Sproul/Claysburg).
All work on this approximately $9.9 million project is expected to be completed by July 2023. All work is weather dependent.
Subscribe to PennDOT news in Bedford, Blair, Cambria, Fulton, Huntingdon, and Somerset counties at www.Penndot.pa.gov/District9
Motorists can check conditions on more than 40,000 roadway miles by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras.
511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts.
Follow local PennDOT news on Twitter and like the department on Facebook and Instagram.
Contact: Monica R. Owens, moowens@pa.gov, 814-696-7105
# # #