2026 Detours

Blair County


  • Scope: Structure replacement​
  • Traffic Control: Detour (8.1 miles)​
  • Construction Timeframe: June – July 2026​
  • Detour Implementation Date: June 2, 2026​ 
  • Anticipated Date Detour to be Lifted: July 7, 2026​
  • Contractor: Glenn O. Hawbaker, Inc.​
  • Current Contract: $5,136,136​ (Bid with Route 3013 Blair Gap Run Bridge​)

 

View Route 3013 Dry Run Bridge Map (PDF).

 

 

 

 






  • Scope: Resurfacing and Slide Stabilization​
  • Traffic Control: Detour (23.5 miles)​
  • Construction Timeframe: March 2026 to July 2027
  • Detour Implementation Date: March 24, 2026
  • Anticipated Date Detour to be Lifted: August 2026
  • Contractor: New Enterprise Stone & Lime, New Enterprise, Pa.
  • Current Contract: $8,405,252.50

 

View Route 453 Tyrone Snyder Twp Detour and Project Map (PDF).

Visit the Route 453 Tyrone Snyder Twp Resurfacing and Slide Stabilization Project Page

 

 

 

 





Cambria County


  • Scope: Bridege Rehabilitation ​
  • Traffic Control: Detour (2.9 miles)​
  • Construction Timeframe: March to October 2026​
  • Detour Implementation Date: March 30, 2026​ 
  • Anticipated Date Detour to be Lifted: October 2026
  • Contractor: J.F.Shea Construction, Inc., Mount Pleasant, Pa.
  • Current Contract: $2,257,170 

 

View Route 3104 Mt Airy Drive Bridge Rehab Detour Map (PDF).