Interstate 79 Overnight Ramp Work Begins Monday in Allegheny County

Pittsburgh, PA – PennDOT District 11 is announcing nightly closures of the northbound I-79 to westbound I-376 (Parkway West) ramp in Robinson Township, Allegheny County will begin Monday night, May 19 weather permitting.

The northbound I-79 ramp to westbound I-376 (Exit 59B) will close weeknights from 7 p.m. to 6 a.m. through Friday morning, May 23 to allow crews to conduct joint sealing operations.

Ramp traffic will be detoured.

Posted Detour

  • Continue straight on northbound I-79 past the closed ramp
  • Take the Route 60 Crafton/Moon Run (Exit 60) off-ramp
  • Turn left onto Route 60 (Steubenville Pike)
  • Take the ramp to I-79 South toward Washington
  • From southbound I-79, take the ramp to West 376 toward Pittsburgh International Airport/Beaver (Exit 59B)
  • End detour

Work on this $14.97 million highway restoration project in Robinson and Kennedy townships began in April 2024. The project begins at the I-376 Airport/Pittsburgh (Exit 59 A/B) interchange and continues approximately one-half mile north of the Route 60 Moon Run/Crafton (Exit 60 A/B) interchange. Work includes concrete pavement patching, guide rail and cable barrier replacement, highway lighting and signing updates, drainage work, pavement markings and other miscellaneous construction activities on mainline I-79 and ten ramps (four at the I-376 interchange and six ramps at the Route 60 interchange). There will continue to be bridge preservation work on six structures (northbound and southbound I-79 bridges over I-376, Route 60, and Campbells Run Road), including concrete deck overlays, replacement of seals at expansion dams and deck joints, substructure concrete repairs, cleaning of bridge bearings and spot painting of the northbound and southbound I-79 steel I-beam bridges over I-376. Additionally, there will be preservation work of six existing sign structures (one on northbound I-79 and five on southbound I-79) as well as concrete repairs and scour protection of two arch culverts underneath mainline I-79 and several ramps.  The project is anticipated to conclude in the late spring of 2025.

The prime contractor is Golden Triangle Construction Company, Inc. Work on this project will be coordinated with other projects in the area.

Motorists can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.

Subscribe to PennDOT news and traffic alerts in Allegheny, Beaver, Lawrence counties at www.penndot.pa.gov/District11.  

Information about infrastructure in District 11, including completed work and significant projects, is available at www.penndot.pa.gov/D11Results. Find PennDOT’s planned and active construction projects at www.projects.penndot.gov.

Find PennDOT news on XFacebook and Instagram.

MEDIA CONTACT: Nicole Haney, 412-429-5011

# # #