Clearfield, PA – The Pennsylvania Department of Transportation (PennDOT) updated drivers on its Atherton Street (Route 3014) project, which stretches from Curtin Road to just north of Westerly Parkway in State College. While the contractor has no work scheduled on Friday, October 13, or Saturday, October 14, to mitigate traffic impacts for Penn State's matchup against UMass, motorists traveling through the work zone can expect the following during the week of October 9:
- A crew will place a waterline between Sunrise Terrace and Westerly Parkway. PennDOT will set the signal at the Westerly Parkway intersection to "flash" mode. Flaggers in the roadway will enforce an alternating traffic pattern.
- Three crews will work between West Fairmount and Logan avenues on shoulder reconstruction. They will also pour sidewalk and curbing. This work will occur in the already closed lanes. PennDOT does not anticipate additional traffic impacts.
The contractor may reduce traffic to a single lane with flaggers in the roadway between 7:00 AM and 7:00 PM throughout the week. One lane will always remain open in each direction during non-working hours.
PennDOT also urges motorists to pay attention to work zones and directional signage to enhance safety and keep traffic moving efficiently. Message boards alerting motorists to the construction zone and changing traffic patterns remain in place.
PennDOT posts updates and detour information on the Atherton Street project page weekly and encourages drivers to visit the page at www.penndot.pa.gov/AthertonStreet.
Overall work on the project includes roadway reconstruction, drainage improvements that include pipes and inlets, water and sewer lines, concrete curbing, sidewalks and detectable warning surfaces, pavement markings, traffic signals and supports, and miscellaneous items.
HRI, Inc. of State College is the contractor on this $30.7 million project. PennDOT anticipates the contractor completing the project in the fall of 2024, but all work is weather and schedule dependent.
PennDOT reminds motorists that intermittent traffic stops are possible for short periods during work activities and urges drivers to use caution when traveling through the work zone. PennDOT also reminds drivers not to follow construction equipment into the closed lane and to use both lanes to the merge point to minimize traffic back-ups and shorten travel delays when approaching the work zone.
Motorists can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information, and access to more than 1,000 traffic cameras.
511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts accessible on the 511PA website.
Subscribe to PennDOT news in Cameron, Centre, Clearfield, Clinton, Elk, Juniata, McKean, Mifflin, and Potter counties at www.penndot.gov/District2.
Follow PennDOT on X and like the department on Facebook and Instagram.
# # #