Pittsburgh, PA – PennDOT is announcing slide repair work on Route 1013 (Saxonburg Boulevard) in West Deer Township, Allegheny County, will begin Monday, September 11 weather permitting.
Slide repair work requiring the closure of a portion of Saxonburg Boulevard between Trump Road and Saxony Road will begin at 7 a.m. Monday. The roadway will close to through traffic around-the-clock until Friday, September 22. Traffic will be detoured.
Posted Detour
South of the Closure
-
From Saxonburg Boulevard, take Russellton-Dorseyville Road
-
Turn left onto East Union Road
-
Follow East Union Road to Saxonburg Boulevard
-
End detour
North of the Closure
-
Same detour in the opposite direction
PennDOT crews will conduct slide repair work and roadway reconstruction.
Motorists can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras.
511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional Twitter alerts accessible on the 511PA website.
Contact: Nicole Haney, 412-429-5011
# # #