Project Status
Step 2 of 4
Design
Next Step: Construction
Public Outreach
Virtual Plans Display
The virtual plans display will be available online from August 26, 2025 through September 23, 2025.
Public Comment Period
The public comment period, where the community is encouraged to respond with questions and concerns will be from August 26, 2025 through September 23, 2025.
Project Overview
County: Armstrong
Municipality: East Franklin Township
State Route: 4023
Local Name: Tarrtown Road
Project Type: Slide Remediation
MPMS Number: 119578
Proposed Construction Start: 04/01/2027
Proposed Construction End: 11/01/2027
Last Updated: 08/26/2025
Slide repairs along Route 4023, Tarrtown Road in East Frankling Township, Armstrong County. Two slides will be repaired through the use of soil nails. One lane of traffic will be maintained through construction with the use of signals. Construction is set to take place in the spring of 2027 with a completion in the fall of 2027.
Contact Information
Devin Patton
Project Manager
724-357-3125
devpatton@pa.gov
Tina Gibbs
Press Office
724-357-2829
chgibbs@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.