Project Status
Step 2 of 4
Design
Next Step: Construction
Project Overview
County: Allegheny
Municipality: Upper St. Clair Township
State Route: 3002
Local Names of State Routes Involved: Country Club Drive
Project Type: Bridge Rehabilitation
Proposed Construction Start: Spring 2026
Proposed Construction End: Summer 2026
Last Updated: 07/31/2025
The proposed project consists of the rehabilitation of Country Club Drive bridge which carries two lanes of Route 3002 (Country Club Drive) over Route 19 (Washington Road) in the Township of Upper St. Clair, Allegheny County. The bridge is currently closed due to the deteriorated condition of concrete noted during the recent bridge inspection. The project will remove and replace the existing concrete arch portion of the rigid frame bridge in order to reopen this bridge to traffic. The project will also include minor approach roadway work on Country Club Drive, asphalt milling and paving on Washington Road beneath the bridge, sidewalk replacement, guide rail upgrades, and pavement marking application. Construction is expected to begin in spring of 2026 and conclude in summer of 2026.
Detour
The current detour for Country Club Drive will remain in effect until construction has concluded in summer of 2026. The detour length is approximately 2.3 miles long utilizing McMurray Road and Old Washington Road.
Construction activities will require two weekend closures and detours of Route 19 (Washington Road): one at the beginning of construction in the spring and one toward the end of construction in the summer. Separate car and truck detour routes are required. The car detour length is approximately 8.5 miles long utilizing Boyce Road, Mayview Road, Lesnett Road, and McLaughlin Run Road. The truck detour length is approximately 26 miles long utilizing Boyce Road, Washington Pike, Interstate 79, Interstate 376, Saw Mill Run Boulevard, and West Liberty Avenue. Otherwise, Washington Road will be restricted to two travel lanes (one in each direction) through the project area during construction of the project.
Contact Information
Dominic Altieri
Project Manager
412-429-4863
doaltieri@pa.gov
Mark Young
Environmental Planning Manager
412-429-4858
markyoung@pa.gov
Steve Cowan
Press Officer
412-334-5436
stcowan@pa.gov
Accessibility
The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Project Manager listed above.
Title VI
Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.