Project Status

Step 2 of 4

Design

Next Step:  Construction

Public Outreach

Public Plans Display

The hard copy plans will be available for review at the Washington Township Municipal Building (14 Creek Road, East Berlin, PA, 17316) from April 30, 2025 through June 2, 2025

Virtual Plans Display

​The virtual plans display will be available online from May 2, 2025 through June 2, 2025.

Public Comment Period

The public comment period, where the community is encouraged to respond with questions and concerns will be from May 2, 2025 through June 2, 2025.

Project Overview

County: Dauphin
Municipality: Washington Township
State Route: Route 1007-024
Local Name: Wilhour Road over Wiconisco Creek
Project Type: Bridge Rehabilitation
MPMS Number: 99912
Proposed Construction Start: Fall 2026
Proposed Construction End: Spring 2027
Last Updated: May 2025

The Pennsylvania Department of Transportation (PennDOT) invites the public to an online plans display regarding State Route 1007 Section 024, Wilhour Road (Bridge Rehabilitation) at the Wiconisco Creek crossing. This project is located in Washington Township and Dauphin County between US 209 and North Church Street.

The proposed project will be the replacement of the superstructure (bridge beams, deck, and parapet walls) of the existing bridge, pavement reconstruction on the bridge approaches, and guide rail improvements. Construction will occur during a full closure of the project area with a detour utilizing North Church Street and US 209.

The project is currently in design, and construction work is expected to take place in the 2026 and 2027 construction seasons. The duration of construction is anticipated to last 6 months. A digital version of the project plans and information will be available to view online from approximately May 2, 2025, through June 2, 2025. The hard copy plans will also be available for review at the Washington Township Municipal Building during the dates listed above.

Contact Information

Pharon Bertsch, P.E.
PennDOT Senior Project Manager
717-705-6209
pbertsch@pa.gov

David M. Thompson
Media Contact
(717) 787-1446
dmthompson@pa.gov

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the PennDOT Project Manager listed above.

Title VI

Pursuant to the Title VI of the Civil Rights Act of 1964, PennDOT does not discriminate on the basis of race, color, national origin, gender, age, or disability. If you feel that you have been denied the benefits of, or participation in a PennDOT program or activity, you may contact the PennDOT, Bureau of Equal Opportunity, DBE/Title VI Division at 717-787-5891.