Project Overview
County: Luzerne
State Route: SR 0080-352 (Interstate 80)
Local Name: I-80 Nescopeck Creek Bridges
Project Type: Bridge Replacement
Start of Construction: May 2024
Anticipated Bridge Completion: Fall 2027
Design and Construction Cost: $98 million
Designer: Michael Baker International
Last Updated: June 2025
The I-80 Nescopeck Creek Bridges are dual structures (one eastbound and one westbound) built in 1965 and with preservation repairs last conducted in 2005. These bridges cross over Nescopeck Creek in Black Creek Township, Luzerne County. Combined, the bridges carry an average of 33,000 vehicles per day, approximately 36 percent of which is truck traffic.
The purpose of the I-80 Nescopeck Creek Bridges Project is to provide a sustainable travel way/crossing that accommodates interstate highway freight and mobility while providing a safe and efficient highway for motorists over Nescopeck Creek. The project will replace and widen the bridges to provide wider shoulders that meet current standards and accommodate and facilitate future maintenance activities on the bridge. Once complete, the new bridges will improve traffic flow, extend the life of existing infrastructure, and enhance traffic safety.
Tank Road Reopening & Structure Phase 1 Construction
Following the successful reopening of Tank Road in November 2024, construction continues on Phase 1 of the new structure. Crews are actively working on substructure elements, including pier and abutment construction, as the project advances on schedule
Site overview of the Nescopeck Bridge Project
The below image shows completed Phase 1 work as of May 1, 2025. The photo is taken facing west from the Abutment 2 side of the structure. In the background, Pier 3, Pier 2, portions of Pier 1, and Abutment 1 are visible in sequence. Concrete bulb-T beam placement was scheduled shortly after this photo was taken.
Nescopeck Abutment 1
The below photo was taken from the Abutment 1 side of the bridge, facing east toward Abutment 2. Beams for Phase 1 have been set, and deck formwork is being installed in preparation for the concrete bridge deck.
-
Project Map (PDF)
-
What is the National Environmental Policy Act?
-
What is a Categorical Exclusion (CE)?
-
October 2022 Approved Categorical Exclusion (PDF)
-
Fall 2022 I-80 Nescopeck Creek Bridges Categorical Exclusion Information
-
Project History & Funding
-
February 29, 2024 I-80 Nescopeck Pre-Construction Public Meeting Presentation