District 8 Projects - York County

Camp Betty Washington Road Improvements Project

Step 2 of 4

Design

Next Step:  Construction

Project Overview

County: York
State Route: 2005-004
Local Name: Camp Betty Washington Road Improvements Project
Project Type: Pavement Widening, Bridge Replacements, and Safety Improvements
Proposed Construction Start: Spring 2027
Proposed Construction End: Fall 2028
Last Updated: July 2025

The Pennsylvania Department of Transportation is currently performing preliminary engineering and environmental studies for a planned project to provide roadway improvements to SR 2005 (Camp Betty Washington Road).  This roadway connects Springwood Road to PA 124 (Mount Rose Avenue) and is located in York and Springettsbury Townships in York County

The purpose of the project is to provide a safer roadway corridor for the traveling public and replace two structures that are considered structurally obsolete.

The project scope includes approximately 3 miles of roadway widening, overlay, and safety improvements on SR 2005 (Camp Betty Washington Road and Haines Road) from the SR 2002 (Springwood Road) intersection to approximately 1500' south of the SR 0124 (Mount Rose Avenue) intersection.

Additional improvements along SR 2005 include:

  • Replacement of the bridges over Mill Creek and an Unnamed Tributary of Mill Creek
  • The addition of an unsignalized northbound left turn lane at Chestnut Hill Road
  • Drainage, guide rail, signing, and pavement marking upgrades
  • Removal of rock outcrops, stone walls, vegetation, or other hazardous features along the corridor
  • Two short roadway realignment locations to improve curves and sight distance

The project is currently in the final design phase, and work

Past Public Outreach

A public “open house” meeting was held on June 15, 2023, from 5:00 to 8:00 PM at the York Township Municipal Building to share information and get input on the proposed project. This included a 30-day comment period. The public meeting resource documents are listed on this page.

Accessibility

The project documents can be made available in alternative languages or formats if requested. If you need translation or interpretation services, have special needs, or have concerns that require individual attention, please contact the Manager listed above.