Infrastructure and Energy Alternatives Inc. has been permitted to install a 100 megawatt ground-mounted principal solar energy system across 12 parcels totaling approximately 1,066 acres in Fannett Township, Franklin County. The project improvements include solar arrays, access roads, a substation, and necessary stormwater management measures. The existing properties consist of primarily open agricultural land and woodlands.
Chapter 102
- Application Form
- General Information Form (GIF)
- Fannett Township Municipal Notification
- Franklin County Notification Form
- PA Natural Diversity Inventory (PNDI) Receipt
- PA Fish and Boat Species Impact Review Letter
- PA Historical and Museum Commission Letter
- Module 1 - Erosion and Sedimentation Control Report
- Erosion and Sedimentation Control Plan Sheets
- Module 2 - Post Construction Stormwater Management Report
- Post Construction Stormwater Management Plan Sheets
- Drainage Area Delineation Maps
- Offsite Discharge Analysis
- Existing Conditions and Demolition Plan Sheets
- Geotechnical Engineering Report
- Module 3 - Antidegradation Analysis
- Wetland and Water Resources Delineation Report
- Wetland Discharge Analysis Report
- Wetland Discharge Location Plan Sheet
- Issuance Letter - Permit - Fact Sheet