Pittsburgh, PA – PennDOT District 11 is announcing the closure of Greentree Road (Route 3052) in Scott Township, Allegheny County will occur Friday night, August 11 through Monday morning, August 14 weather permitting.
Concrete patching will occur on Greentree Road from 6 p.m. Friday continuously through 6 a.m. Monday requiring the closure of a portion of the roadway to through traffic in both directions between Old Washington Pike and Hope Hollow Road. Traffic will be detoured.
Posted Detours
West of the Closure
-
From Greentree Road, take Route 50 eastbound
-
Turn right onto Hope Hollow Road
-
Follow Hope Hollow Road back to Greentree Road
-
End detour
East of the Closure
-
Same detour in the opposite direction
Local traffic will be accommodated to the work area location.
The prime contractor on this $7.41 million group paving job is Mele & Mele & Sons, Inc.
Motorists can check conditions on more than 40,000 roadway miles, including color-coded winter conditions on 2,900 miles, by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information, and access to more than 1,000 traffic cameras.
511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional twitter alerts accessible on the 511PA website.
Contact: Steve Cowan, 412-429-5010
# # #